Metal Stud Framing
Light gauge layout and framing for partitions, soffits, shafts and fire-rated assemblies. Laid out off your drawings, plumb and on grid.
Read the full metal stud framing scope, including what we hand off and what we do not touch.

Most interior packages get split across three subs, and the seams between them are where schedules go to die. The framer blames the drywall crew, the drywall crew blames the grid guy, and the general contractor spends a week refereeing.
We self-perform all three. Same crew, same foreman, same phone number from layout through punch list. When something is wrong it is ours, and you only have to tell one person.
Light gauge layout and framing for partitions, soffits, shafts and fire-rated assemblies. Laid out off your drawings, plumb and on grid.
Read the full metal stud framing scope, including what we hand off and what we do not touch.

Hang, tape and finish through Level 5. Fire-rated and moisture-resistant board, offset joints, and a surface that takes paint without telegraphing.
Read the full drywall and finishing scope, including what we hand off and what we do not touch.

Suspended acoustical grid hung to elevation and squared to the room, coordinated around sprinkler heads, diffusers and light fixtures.
Read the full ceiling grid scope, including what we hand off and what we do not touch.

So you know what still needs covering in your bid package. If any of this is negotiable on your job, ask. We would rather have the conversation at bid time than at framing inspection.
Topgolf, iFLY, Overdrive Raceway, MOD Pizza and six more. Every one of them is the same framing, board and grid scope described above, at a different size.
Plans, a scope, or even a set of photos and a walk date. We will come back with a number and a schedule we can actually hold, usually inside two business days.
Mon through Sat, 8AM to 5PM · Colorado Springs, CO